Factory directly provided Bolted Clamp PA-4 10-50 for America Manufacturers

Product information:


Product Detail

Product Tags

, , ,
Factory directly provided Bolted Clamp PA-4 10-50 for America Manufacturers Detail:

 

 


Product detail pictures:

Factory directly provided
 Bolted Clamp PA-4 10-50 for America Manufacturers detail pictures

Factory directly provided
 Bolted Clamp PA-4 10-50 for America Manufacturers detail pictures

Factory directly provided
 Bolted Clamp PA-4 10-50 for America Manufacturers detail pictures


Factory directly provided Bolted Clamp PA-4 10-50 for America Manufacturers, The product will supply to all over the world, such as: , , ,



  • More info at https://www.autopartscheaper.com/products/acura-tl-front-license-plate-tag-bracket

    2004-2008 Acura TL Front License Plate Bracket Oem Brand New



    We recently completed the relocation of five high voltage towers for the Gateway Upgrade North project. It was no small task, but Energex have it down to a fine art.

    Video transcript: Craig Darke: Hi I’m Craig Darke. I’m a Project Manager for Energex. Tonight we’re here to relocate two 110,000 volt powerlines. These two powerline feeders basically feed the majority of the north side of Brisbane down near the Brisbane airport.

    Craig (voiceover): To get to where we are tonight a lot of careful planning and forethought has gone in to it. There has been a good close relationship between Transport and Main Roads and Energex.

    Matt Smith: My name is Matt Smith and I work for the Department of Transport and Main Roads as Project Manager on the Gateway Upgrade North project.

    Matt Smith (voiceover): Transport and Main Roads and Energex have been working together for two and a half years on this project, carefully planning the activities required to safely transfer the high voltage lines between the existing towers and the new power poles. These works are being undertaken as part of the Gateway Upgrade North project and are being delivered by Transport and Main Roads with assistance from Transurban Queensland. This project is jointly funded between the Australian and Queensland Government and is due for completion in late 2018.”